Energy Performance Program

Start today with the Energy Performance Program, get a baseline energy model, receive a pre-project incentive and annually thereafter.

A Save on Energy program, delivered by Enerva on behalf of the IESO

Enerva IESO – Connecting Today. Powering Tomorrow.
Modern glass office towers with trees in the foreground Flag of Canada

Grow your energy savings year over year

The Energy Performance Program (EPP) rewards you for the behavioural and operational changes that make your capital investments pay off — so your savings grow year over year, your operating costs drop, and your productivity improves.

Three years of annual pay-for-performance incentives are available for applications approved by
December 31, 2027.

Aerial view of a large distribution warehouse and its parking lot

It's easier to participate
now than ever

  • $0.30/kWh

    During summer peak hours, $0.08/kWh at all other times

  • Pre-project incentive

    Then annual payouts as you keep saving

  • Baseline energy model

    Built from your own facility data

  • Technical support

    From the EPP team throughout your enrollment

How incentives are
calculated

Your incentive = incentive rate ×
electricity savings, measured against
your baseline energy model.

$0.30/kWh

Savings on business days from June 1 to September 30
(inclusive), between 3 p.m. and 9 p.m. EDT.

$0.08/kWh

Savings at all other times of the year.

“The Energy Performance Program
enables you to use the whole facility
approach to establish a baseline and
calculate your electricity savings.”

Zaheer Khalfan Zaheer Khalfan Senior Energy Manager, Triovest
Aerial view of a dark-clad industrial building

Is your facility eligible?

You can apply if you:

  • Own or operate a commercial, institutional, or industrial facility in Ontario with a >50kW commercial account

  • Have 12 months of hourly interval meter data

  • Can commit to three years in the program and 5%
    energy savings within two years

Not sure if you qualify?

The EPP team can walk you through the requirements and help you enrol


Talk to the EPP team →

How it works

  1. Step 1

    Create an account

    Register yourself and your team in the EPP portal.

  2. Step 2

    Sign the Participant.
    Agreement and add your facility

    Upload your signed agreement, facility details, 12 months of hourly interval data, and a recent utility bill. We generate your baseline energy model for your review and approval

  3. Step 3

    Implement measures and earn

    Make the capital, operational, and behavioural changes that reduce your consumption. Your savings are measured against your baseline, and you earn $0.30/kWh for summer peak savings and $0.08/kWh the rest of the year.

Before you apply:

Enrolling requires a signed Participant Agreement — a three-year commitment to the program.

Read the Participant Agreement →

What's new

A utility bill on a clipboard in front of industrial gauges

New eligibility rules

All Ontario facilities with a >50kW commercial account are now eligible for EPP. There is not a minimum electricity consumption required anymore, and facilities do not need to be aggregated.

Hands typing on a laptop with model wind turbines behind

Baseline energy model

Enter your facility details and upload your data in the EPP portal and we’ll provide your baseline model. The baseline model can account for single or multiple independent variables. It can be used for other purposes such as energy and carbon reporting and benchmarking. There are multiple different reports and data visualizations available in the EPP portal.

Aerial view of a dark-clad industrial building

Simplified incentive structure based on energy savings

Earn incentives any time, all the time and even more during peak hours. You can earn $0.30/kWh for energy savings during peak hours (all business days between June 1- September 30 (inclusive), during the hours of 3pm to 9pm EDT. Energy savings during all other times earn an incentive of $0.08/kWh.

Everything You Need to Know

Am I responsible for creating the baseline energy model?

With the new EPP Portal, you only need to provide minimal building details, one year of hourly interval data, a recent electricity utility bill, and the baseline energy model gets generated automatically. However, if the created baseline model doesn’t meet the program requirement criteria, you will be asked to provide hourly or daily data of the parameters that influence the electricity consumption.

What if I don’t have 12 months of hourly interval data?

The program requires that you have 12 months of hourly interval data for each facility. If you do not have 12 months of hourly interval data, it may still be possible that you are able to enrol. Please contact us at: info@energyperformanceprogram.ca or 1-888-852-2440. Make sure to see what other programs you may be eligible for at www.saveonenergy.ca.

How long does it take to receive approval to participate in the Energy Performance Program?

With the new EPP Portal, the application process and technical review can be completed in as little as a week. Note that this does not include time associated with information requests or discussions between the applicant and the technical reviewer that may be necessary for an approved baseline energy model to be generated.

Can I add additional facilities if my organization is already participating in the Energy Performance Program?

Yes, additional facilities can be enrolled under the organization’s existing EPP Participation Agreement, with each having its own pay-for-performance periods.

Is there a locked-in period for participating in the program?

Yes. The participant is committed to the program for a three-year term for each approved facility.

I’m planning on submitting an application. When can I start implementing projects?

The IESO recommends waiting for your application to be approved before implementing any energy or demand saving measures and activities. You may commence your projects once your application is submitted but choosing to do so before receiving approval means you take on the risk of not receiving incentives for initiated measures and activities should your application not be approved.

Can I enroll in the Energy Performance Program if I’m participating in another Save on Energy program?

If there is a Retrofit Program project at the facility that has not yet reached post-project submission, you may still be eligible to enroll the facility in the Energy Performance Program. Please contact us at: info@energyperformanceprogram.ca or 1-888-852-2440.


You are eligible to participate in the Instant Discounts Program, however, the associated savings will be removed via a baseline adjustment.

Should I pursue the Retrofit Program or EPP to support energy efficiency within my facility?

The Retrofit Program provides incentives on a per-measure basis to support specific energy-efficiency capital projects and initiatives. The EPP provides incentives on a facility level and measure-agnostic basis. In EPP, i.e., savings are assessed based on overall reduction to facility energy use resulting from equipment upgrades, operation and maintenance (O&M) improvements and/or behavioural initiatives.

The EPP provides a three-year term with annual payments for total energy savings achieved through each of the three performance periods. In addition to offering incentives for facility improvements that are not currently available under the Retrofit Program (e.g., O&M and behavioural changes), the three-year cumulative value of the incentives paid under the EPP can often exceed the Retrofit incentives available for the same equipment upgrades.

A comprehensive comparison of the EPP and Retrofit program can be found here.

What are the new incentive rates?

For participants who enroll on or after January 1, 2025, there is a new incentive rate of $0.30/kWh for electricity consumed during business days between June 1 and September 30 (inclusive), between the hours of 3 p.m. and 9 p.m. (EDT). The incentive rate for savings outside of summer peak hours has also increased to $0.08/kWh.

For participants who enrolled prior to January 1, 2025, their incentives will remain unchanged at $0.15/kWh for electricity savings during summer peak hours and at $0.04/kWh for electricity savings outside of summer peak hours.

How are performance incentives calculated?

Participants receive a performance incentive calculated as incentive rate multiplied by electricity savings. The electricity savings are determined by comparing metered consumption to the facility’s baseline energy model.

The incentive rates are:

  • $0.30/kWh for savings during on-peak hours* or $0.15/kWh for savings during on-peak hours*, in accordance with your Participant Agreement
  • $0.08/kWh for savings during off-peak hours or $0.04/kWh for savings during off-peak hours, in accordance with your Participant Agreement

* Electricity consumed on weekdays between June 1 and September 30 (inclusive), between the hours of 3 p.m. and 9 p.m. (EDT).

When do I receive payment for the savings I have achieved in my pay-for-performance period?

You will receive an incentive corresponding to the approved savings achieved during each pay-for-performance period. You must submit an invoice for the savings incentive amount provided in the approved savings report plus applicable taxes to info@energyperformanceprogram.ca. Please allow eight to 12 weeks to receive your incentive payment.

How does the upfront pre-project incentive payment work?

Once a participant’s application is approved, the participant will receive an optional one-time advance of part of the anticipated performance incentive for each approved facility, calculated as follows:

Baseline Energy Consumption * 2.5% * $0.08/kWh

Is the upfront pre-project incentive payment mandatory?

No. Both the IESO and the participant enter into the program with the expectation of saving a minimum of five percent of the facility consumption, but the IESO understands that changed circumstances can impact a participant’s ability to meet this minimum requirement. The IESO is therefore offering participants the flexibility to forgo the pre-project incentive payment and to receive payment only for actual savings achieved through the pay-for-performance period reporting.

When do I receive payment if I elect to receive the upfront pre-project incentive? Is anything required for me to receive the Incentive?

You can elect to receive the upfront pre-project incentive after your facility has been approved to participate in the EPP. You must submit an invoice for the approved pre-project incentive amount plus applicable taxes to info@energyperformanceprogram.ca. Please allow eight to 12 weeks to receive your incentive payment.

What are the requirements for metering data?

Hourly interval data sourced from a Measurement Canada-certified meter is required to create your 365-day model. If you have data in intervals more frequent than hourly (e.g., 15-minute intervals), this can be aggregated into hourly data in the EPP Portal.

How are electricity savings calculated?

For the Energy Performance Program, IPMVP Option C (whole building analysis approach) is used to calculate electricity savings.

The IPMVP uses this equation:

Avoided Energy Consumption = (Baseline Period Energy ± Routine Adjustment to Reporting Period Conditions ± Non-Routine Adjustments to the Reporting Period Conditions) - Reporting Period Energy

How are non-routine baseline energy model adjustments handled?

Non-routine adjustments to baseline models are done on a case-by-case basis depending on the type of facility.

You should always inform the service provider of any significant operational changes in your facility, who will then work with you to determine whether the non-routine adjustment approach can be considered during the reported period. Any non-routine events (NREs) and non-routine adjustments (NRAs) should be performed in accordance with the IPMVP Application Guide on Non-Routine Events & Adjustments, October 2020, EVO 10400 - 1:2020.

Please refer to the EPP Technical Guide found on the program website.

How are savings rationalized for weather variances and occupancy changes?

The baseline energy use for the facility is determined based on weather and can also be adjusted for regularly occurring occupancy changes. When savings are reported under the conditions of the reporting period, they are compared against this baseline, which is adjusted to reflect the conditions of the reporting period. This approach aligns with the International Performance Measurement and Verification Protocol (IPMVP) avoided energy methodology.

Is a new baseline model generated after each of the pay-for-performance periods?

No. The EPP Portal generates a baseline energy model that remains valid for all pay-for-performance periods. However, if there’s an unforeseen change at the facility, such as an expansion or a significant shift in occupancy, this could trigger a non-routine adjustment. In such cases, the service provider will address these non-routine adjustments based on the information provided through the EPP Portal regarding the non-routine event.

Already reporting under EWRB?

If you report your building's energy and water use under Ontario's EWRB initiative, you've already done much of the data work EPP requires. The same building data that feeds your EWRB report helps build your EPP baseline model.

Learn about EWRB at ontario.ca Track to Save – Protect Ontario
  • Access consistent and standardized information about
    your building’s performance.

  • Track building usage and save money.

  • Identify water and energy efficiency opportunities.

  • Compare your water and energy usage to buildings
    similar to your own.

  • Enhance your energy management with better data
    utilization, integration, and analytics.

Contact us if you want to learn more
about EPP